Contact us
Status Permitting underway

Reliable power.
Local commitment.

Lume Power is a two-phase natural gas generating facility planned near Franklin, Georgia.

Scroll · Enter the project
  1. 01 Site
  2. 02 Permit
  3. 03 Build
  4. 04 Operate
01 — Site

A 330-acre site on Sellers Road near Franklin.

The property is about 40 miles southwest of Atlanta, next to the Georgia Transmission Corporation 230 kV system and within 3 to 5 miles of the Transco pipeline. Project 1 occupies 13 acres and Project 2 occupies 11.2 acres.

02 — Permit

Permitting is underway with state, federal, and local agencies.

Environmental field surveys are complete and the air permit application was submitted to Georgia EPD on September 29, 2026. The land use and special use permit is in review with Heard County, and construction permits are expected in summer 2027.

03 — Build

Two phases of construction on a single site.

About 210 construction workers at peak per phase sourced from Heard County and the Atlanta metropolitan area. Project 1 is built first, followed by Project 2.

04 — Operate

836 MW of fast-start capacity for the regional grid.

Project 1 adds 458 MW from late 2028, and Project 2 adds 378 MW in 2029, using industrial gas turbines of about 38 MW each in simple cycle. The facility supports at least 21 permanent positions over an operating life of 30 years or more.

Quick facts · Lume Power01 / 04 · Site
Property sizeHeard County, Georgia
~330 acres
Distance from AtlantaSellers Road, Franklin
~40 mi SW
Electrical interconnectionGeorgia Transmission Corporation 230 kV
Adjacent
Initial field surveysBiological, cultural, and waters of the U.S.
Complete
Air permit applicationGeorgia EPD
Sep 29, 2026
Interconnection applicationsGTC · P1 Sep 4 · P2 Sep 30, 2026
Submitted
Construction permits expectedHeard County and Georgia EPD
Summer 2027
Construction phasesProject 1 first, then Project 2
2 phases
Peak workforceConstruction workers per phase
~210
Workforce sourceHeard County and the Atlanta metropolitan area
Planned
Project 1 · 458 MWOnline Q4 2028 through Q2 2029
Phase 1
Project 2 · 378 MWOnline Q3 2029 through Q4 2029
Phase 2
Turbine sizeIndustrial gas turbines · simple cycle · fast start
~38 MW
Permanent positions$3+ MM annual operating payroll 
21+ positions
Key figures

What the project means for Heard County.

Two phases of natural gas generation totaling 836 MW, bringing construction jobs, permanent operations positions, and reliable fast-start power to Heard County.

0MWTotal capacity · two phases
<0%Approx. annual capacity factor
0Construction jobs at peak · per phase
0+Permanent jobs · 30+ years
Gas-fired power generating facility
Operations technician inspecting a pipe flange at sunset
Reliable power. Local commitment. Local jobs, open communication, and a long-term neighbor investing in Heard County's future.
The site

Site location and infrastructure.

Lume Energy Center will serve the local electricity market and provide grid reliability for Georgia. This project site was chosen due to its proximity to existing power-related critical infrastructure.

Aerial map of the Lume Power property boundary on Sellers Road with nearby transmission lines
Property boundary · Sellers Road · Nearby transmission lines
Map of Georgia highlighting Heard County
Heard County · Georgia
  • Project 1 13 acres
  • Project 2 11.2 acres
Permitting

Regulatory review and permitting.

Construction permits for Projects 1 and 2 are expected within 12 months across federal, state, and local review.

  1. Environmental field surveys

    Army Corps · FWS · SHPO

    Biological, cultural, and waters of the U.S. delineations completed on the property.

    Complete
  2. Pre-application meetings

    Georgia EPD · Heard County

    Air permit pre-application meeting with Georgia EPD on August 12, 2026, and a planning and zoning pre-application meeting.

    Complete
  3. Air permit application

    Georgia EPD

    Synthetic minor source application with Title V operating permit submitted September 29, 2026.

    Submitted
  4. Land use and special use permit

    Planning and Zoning · Commissioners

    Rezoning from agricultural to industrial with a special use permit, followed by public review.

    In progress
  5. Construction permits issued

    Heard County · Fire Marshal

    Building, grading, fire, sanitary, and related local permits, pending final engineering.

    Expected
Public meetings

Meetings and announcements.

Upcoming public meetings are listed here as they are scheduled. Dates, locations, and materials will be added as they are confirmed.

Upcoming

Heard County Planning Board

Date and timeMonday, December 7, 2026 · 6:00 PM
LocationHeard County Administrative Office
201 Park Ave, Franklin, GA
Upcoming

Heard County Board of Commissioners

Date and timeTuesday, December 15, 2026 · 6:00 PM
LocationHeard County Administrative Office
201 Park Ave, Franklin, GA
Contact

Project inquiries.

Questions about the project? Send an inquiry using the form, or email info@kindle-energy.com. Project updates, public meeting dates, and supporting documents will be published here as they become available.